Refractory Materials on a Spring Site: Storage Between Stages
Posted on
04/23/2026 09:00AM
Building an oven in spring often takes several weekends. The materials then remain on site between stages, and garden conditions change faster than the the planned timetable. Prepare the storage area before delivery so that mortar, adhesive, and insulation are ready for use in the required condition...
High-temperature silicone for sealing joints in pizza ovens, grills and smokehouses
Posted on
03/31/2026 09:00AM
When building or repairing a pizza oven, grill or smokehouse, there is a need to organize selected connections and places where the elements meet. It is in such a context that high-temperature silicone may be a category worth checking out in the Vitcas offer.
The most important thing here is to ma...
Smokehouse Cleaning Access: Plan the Firebox and Flue
Posted on
03/23/2026 09:00AM
Plan smokehouse cleaning access before starting the masonry. The firebox, smoke passage and deposit collection points must remain reachable. A decorative enclosure makes maintenance harder if it permanently covers the only access to a duct.
Draw the smoke route and inspection points
Mark the fir...